December 8, 2011

Floor Insulation & Pigeon Patch

After we realized that there was no way we were going to finish the bathroom construction before my return to New York (because of the time needed to order and deliver the stone tiles), I decided to take a day to deal with a few small tasks that were becoming more and more pressing...particularly as the weather was getting colder and colder.

Back when we leveled the floors at the beginning of the year, we did not install insulation. But now I feel strongly that we need to start making the flat more comfortable - not just bare-minimum livable - so with the temperature dropping and some drafts becoming apparent, it should be done soon. Plus - with the radiator plumbing completed in the bedroom we no longer need access to the floor, so it's good time to do it. After some research, I ordered several very large bags of insulation...
The insulation being delivered
The bags of insulation are quite large!
In addition to the insulation, we also needed to patch a hole in the rear exterior brick wall. This hole was the result of removing the old waste pipe from the original bathroom - it was removed during the plumbing's first fixing - right before the scaffolding was taken down at the end of July.

The "hole"

Not only did the hole let cold air into the cavity of the floor (a big source of drafts in between the joists), but we learned very quickly that a pair of pigeons had moved in! The pigeons did not bother us at all (they were under the floor and off to the side)...in fact "Aglaya" thought it was quite sweet to wake up every morning to the sound of their cooing (and they were LOUD!) But they really bothered a few of our neighbors. Because this would be a messy job (with the bricks & mortar), I figured it would make sense to patch the hole on the same day the floor was insulated.
After removing part of the closet and cutting away the floor boards
The view from the hole (you can see one of the floor joists on the left)
Patching the hole involved making mortar and fitting pieces of brick which meant cutting them individually. What made this difficult was having to work from the inside as there was a 3 story drop below. I should point out that this could not have been done when the scaffolding was up as it did not reach this far over...
The patched hole - sloppy but done
Once the patch was completed, I moved onto the insulation. This was a relatively easy task, but (as usual) it took a bit more time than expected. Having recently been involved in a sound proofing project in New York, I wanted to be sure our floor also provided a decent amount of sound dampening between us and our neighbor below. A key element in sound dampening is to have insulation, but it's better if there's an air gap, so I decided to raise the insulation a few inches above the plaster ceiling using chicken wire to prevent it from slipping. The chicken wire was what took a little time, but within a few hours I had it completed...
Removing the plywood sub-floor to expose the cavity between the joists
Installing the chicken wire between each joist (prevents the insulation from slipping)
Half the insulation installed
The completed insulation
That night we noticed that "the Box" was significantly warmer and the drafts had been minimized...mission accomplished!

June 18, 2011

Finishing the Roof Slates: small area, huge milestone!

Immediately after finishing the Dark Side, I walked to the back of the roof and got started on the only remaining area that needed slates - the little corner at the edge of the new dormer. This area is very small, but has an angled corner on one side and a small section of vertical wall on the other - which meant that it would be a huge pain in the neck.

And sure enough, it was. Besides the time-consuming angled cuts, the weather decided to be difficult once again. It kept raining on and off all day, so I'd get a little done, then have to move inside...this made the work go really, really slowly. I also had to keep going down to check on the plumbers, so I was only able to finish the roof portion, but not the wall. The wall only got done the next day.

But with that, we reached a major milestone - the slates are completely finished! The end of the roof work is in sight...
June 16 - before starting work
The first few battens in place
June 17 - installing the battens
The first slates installed
Starting the 2nd row - the vertical slate was used to locate the starting position (edge) of the roof
It was raining on and off, but managed to get a few rows up.
June 18th - Finished the roof slates, starting on the vertical wall
It's not many slates, but time consuming due to the cuts and hanging everything vertically
Almost every piece has to be custom cut.
3:30pm - Finished! Tired, but happy and relieved!

June 15, 2011

Finishing Off the Dark Side (of the slates)

I've been calling the north side of the roof (facing the street) the Dark Side partly because it does not really get any direct sunlight, but mostly because it has always given me trouble. It's much smaller than its adjacent side, but it has the brick wall with all its flashing on one side, and the other long, dreaded corner. Also, its irregular shape means that towards the top, most of the slates need to be custom cut to the appropriate angle or size. I guess because of these factors, working on it has always taken me more time than I expected - and unfortunately completing it was no different...

I had hoped finishing this side would go quickly, maybe taking a day or two, but it ended up spanning over three days - not only because of the special factors mentioned above, but because on top of all that, the weather turned and it kept raining. The work involved required me to complete half a dozen rows of slates at the top, and then close up the long corner. As you can see from the picture it did not look too bad (at least that's what I thought). The first day went very well, with good weather, but then the weather started interfering.

So with the weather and all the irregular slates, the Dark Side continued to give me trouble, and completing it dragged on and on...
Morning of June 8th - the task ahead (did not look too bad)
First few rows of slates added
Final four rows
Reaching the top (finally)...
View from above
Laying down one of the last slates
For the last slate, you can see how irregular the space is, and the cut needed for the one below
The top row had to have each piece cut irregularly on the top to match the slope of the flat roof
The rows of slates completed...time to fill in the corner
June 15th - (morning) - after some time away, starting the last major corner of the roof
By the end of the day, I was more than halfway there, but it kept raining which slowed things down...
June 16th - With rain all morning, work only really began in the afternoon
The last row to be filled in.
Finished! With both sides completed, roughly 95% of slates are down
Montage of the finished slates

January 10, 2011

An English Winter

As we have the pleasure of being up on the roof during the winter, we have to deal with the cold and rain of a December in England. Because there is no roof and waterproofing, every night we have to cover everything up with blue tarp.
As mentioned in a previous post, I had to put up a temporary roof because the forecast has been for rain (of course) while we're doing our open heart surgery on the roof.


The rain and cold (it's the coldest winter in a while) have definitely made the roof work more difficult and uncomfortable...a far cry from the comfort of the drafting desk!