February 19, 2012

Finishing the Shower: Waterproofing (part 5)

With the tiler coming on Monday, there's only one more day (Sunday) left to finish getting everything ready for him. I guess the one drawback of all that waterproofing is that it took a long, long time to do....so now I realize that we won't have the whole bathroom built out and waterproofed by Monday - there's just no way I can get it all done.

Because the tiler will be starting with the shower, we definitely have to have at least that finished by Sunday night, no matter what. This is starting to feel a bit like deja vu! When we were approaching our other big milestones (finishing the roof and turning the heat on), we ended up doing similar scrambles, with late nights to get everything done. This is a trend I would definitely prefer not to see continue...
Feb 18th - starting point for the final push
The first task is to paint the waterproofing membrane on the plywood floor. We had to do this late Saturday night because it needs to dry overnight if we want to continue working on Sunday afternoon...
Starting to paint the rubberized waterproof membrane on the plywood
The completed shower floor membrane - now it must dry for 24 hours
We did get to enjoy a nice Sunday brunch, and by the time we finished, the membrane was finally dry....so, time to attach the shower base to the plywood. This base is a large, single piece of the Marmox board (an insulated waterproof tile-backer) that's designed for the floor: it's tapered to allow proper water drainage, and has a specially prepared hole that designed to fit with the drain as part of an integrated system.
The waterproof shower base will slide into this gap between the floor and wall
To attach the board to the plywood, we're again using the flexible, waterproof (of course!) tile adhesive.So after mixing up another batch of the adhesive, I carefully applied it using a notched trowel, and slid the floor board in place. I had one and only one shot at this: the board was specially ordered so we only had the one, and I had already cut it down to make it fit perfectly. So I was nervous...if anything went wrong (for example, if the mortar dried before I was finished), we'd have to start all over again and we wouldn't be ready for the tiler...that would be a disaster! I had put a lot of time and effort into doing the prep work to make sure there would be no problems, but you never really know how something is going to go until you actually do it. In this case, happily, all that prep work paid off, and everything come together beautifully!
Sunday, Feb 19th - Afternoon - Applying the adhesive to the plywood
The adhesive fully applied
Sliding in the board
With the board in place, the edges and joints were quickly siliconed, and special attention given to the two-part drain.
The board (shower pan) fixed in place with silicone around the edges
The final tasks for the night involved closing up the area under the shelf/ledge, applying the final waterproofing, and fastening the large piece of wood that will act as the lip and edge of the shower...
Closing-up and waterproofing the area under the shelf/ledge
The shower's lip/edge attached and waterproofed.
...So by 8:30pm (not too bad!) we were finally ready for the tiler.
The completed shower - ready for the tiler
Montage of the bathroom - the night before the tiler starts

February 18, 2012

Under the Shower: Waterproofing (part 4)

With the bathroom wall construction completed, I now have to make major progress on the shower - with the tiler coming on Monday there's a lot of work to do in just four days...

The next step is to finish waterproofing the area under shower, and permanently affix the raised shower floor. As mentioned in previous posts, I've gone a bit crazy with the waterproofing and have several redundant layers to minimize the chances of a leak. As part of this strategy there are actually two "floors" to the shower - the actual raised shower floor (because it is sitting on top of a steel beam), and then the sub-floor, which is level with the rest of the bathroom. Each "floor" - including the entirety of the bathroom floor - is to be fully waterproofed to increase the redundancy, (hopefully!) minimizing the chances that if there is ever a leak, it will not penetrate through to the flat below ours.

I started by waterproofing around the shower drain opening in the sub-floor - a large hole that was cut into the plywood while leveling the bathroom floor and installing plywood around the drain.
Feb 16th - applying the waterproof membrane around the drain
After the membrane was dry, the following day I fitted the Marmox insulated tile backer board, made sure everything fit together properly and prepared a bucket of flexible tile adhesive. As with the shower walls, the combination of the rubberized membrane, waterproof tile adhesive and waterproof tile backer board creates the redundant waterproof assembly.
Feb 17th - fitting the Marmox board in place
Testing to make sure everything fits!
Ready to go - mixed tile adhesive, cleaned sub-floor.
As mentioned in our roof posts, I have a serious aversion to mortar and troweled adhesives...mainly because I'm not that good at working with them and generally make a mess. This time I made a huge effort to learn from those initial experiences, mix smaller batches, and work quickly - yet carefully. Fortunately it went better than I expected, with minimal mess! The sub-floor was coated with the adhesive in sections, and the Marmox boards were placed over them.
Adhesive partially applied
First Marmox board down
Next few pieces on the left - the last section of adhesive on the right
In between the board edges, silicone is applied, and then taped over with a special (and expensive) waterproof tape that completes the waterproofing system at the joints.
Completed Marmox board with silicone along the joints
Extra waterproof tape around the drain opening
After all joints are siliconed and taped, I added several intermediate supports for the raised shower floor, making sure everything was level and cutting openings for the boiler's white condensate line. I then did a few final reviews of the waterproofing to verify there were no gaps or neglected areas, and screwed the waterproof plywood in place.
Feb 18th - Additional wood supports for the plywood base
Final shot before closing-up: fully taped and waterproofed
The plywood based permanently fastened
Permanently attaching the plywood made me somewhat nervous, as from this point onwards, I'll never again be able to access the drain and sub-floor in case there's a leak. I guess this is where having the redundant layers of waterproofing come into play, and provide some peace of mind. Not to mention a bit of confidence from the success of our new roof, and the fact that it has not (so far!) leaked...

December 8, 2011

Floor Insulation & Pigeon Patch

After we realized that there was no way we were going to finish the bathroom construction before my return to New York (because of the time needed to order and deliver the stone tiles), I decided to take a day to deal with a few small tasks that were becoming more and more pressing...particularly as the weather was getting colder and colder.

Back when we leveled the floors at the beginning of the year, we did not install insulation. But now I feel strongly that we need to start making the flat more comfortable - not just bare-minimum livable - so with the temperature dropping and some drafts becoming apparent, it should be done soon. Plus - with the radiator plumbing completed in the bedroom we no longer need access to the floor, so it's good time to do it. After some research, I ordered several very large bags of insulation...
The insulation being delivered
The bags of insulation are quite large!
In addition to the insulation, we also needed to patch a hole in the rear exterior brick wall. This hole was the result of removing the old waste pipe from the original bathroom - it was removed during the plumbing's first fixing - right before the scaffolding was taken down at the end of July.

The "hole"

Not only did the hole let cold air into the cavity of the floor (a big source of drafts in between the joists), but we learned very quickly that a pair of pigeons had moved in! The pigeons did not bother us at all (they were under the floor and off to the side)...in fact "Aglaya" thought it was quite sweet to wake up every morning to the sound of their cooing (and they were LOUD!) But they really bothered a few of our neighbors. Because this would be a messy job (with the bricks & mortar), I figured it would make sense to patch the hole on the same day the floor was insulated.
After removing part of the closet and cutting away the floor boards
The view from the hole (you can see one of the floor joists on the left)
Patching the hole involved making mortar and fitting pieces of brick which meant cutting them individually. What made this difficult was having to work from the inside as there was a 3 story drop below. I should point out that this could not have been done when the scaffolding was up as it did not reach this far over...
The patched hole - sloppy but done
Once the patch was completed, I moved onto the insulation. This was a relatively easy task, but (as usual) it took a bit more time than expected. Having recently been involved in a sound proofing project in New York, I wanted to be sure our floor also provided a decent amount of sound dampening between us and our neighbor below. A key element in sound dampening is to have insulation, but it's better if there's an air gap, so I decided to raise the insulation a few inches above the plaster ceiling using chicken wire to prevent it from slipping. The chicken wire was what took a little time, but within a few hours I had it completed...
Removing the plywood sub-floor to expose the cavity between the joists
Installing the chicken wire between each joist (prevents the insulation from slipping)
Half the insulation installed
The completed insulation
That night we noticed that "the Box" was significantly warmer and the drafts had been minimized...mission accomplished!

July 5, 2011

The Marathon: Finishing the Roof!

After six months of hard work - that sometimes felt would never end - this is the last day we'll be up on the roof. As mentioned in the previous post, this is bittersweet moment - but we're ready to move on.

This is also the last day what of we're calling the marathon - our mad dash to get the roof finished so we can take the scaffold down before I fly back to New York. With my flight rescheduled for the end of this afternoon, there's a hard deadline with much to do by then.

The day started with completing the dormer's lead flashing, so once that was done, one of the last tasks involved installing the exterior vents for our boiler, bathroom and kitchen. These needed to be done before the scaffolding came down because otherwise there would be no way to access the portion of the rear brick wall where the penetrations needed to occur. Fortunately these large 4" holes were already done - when the plumbers were doing their initial installation they had drilled the holes at that point. Installing these vents required clearing out the rough holes, removing and repairing any loose bricks, fitting the pipes & vents, and then packing mortar around the opening so they would be fixed in place.

One of the holes drilled through the bricks by our plumbers
Making sure it fits - Testing one of the pipes and vent plates in the hole
An overall view - had to remove the end planks to get to the work area.
Starting to fill around the pipe with mortar. You can see the completed boiler flue/vent in the background
The vents completed
The next task involved installing the railing for our new Juliet balcony. The support posts had been aligned and set when the concrete was poured, so this was relatively fast and easy - fortunately as there were only two hours remaining before heading to the airport! The railings were ordered and delivered as a kit-of-parts, so each railing piece was fastened into place with four steel brackets that bolted into the posts - relatively easy.
Before setting the railings
The first railing piece in place
The railing installed - can also see the completed dormer
With the railings completed, the final task for finishing the roof involved cleaning the scoffolding of all the debris, unused pieces of wood, and the stacks of old, original slates that we'll sell to the roofing company (apparently they can be re-used on historic preservation/conservation projects). With only an hour to clear all the debris, this was truly a mad dash, but was able to get it done. Before leaving the scaffold for the last time, I took a number of final pictures and soaked in the view for the last time...
The completed roof - view from the front

The completed roof - view from front corner
The completed roof - view from the rear

June 22, 2011

Ridge Tiles - Learning the Hard Way

With the roof slates done, the first item on the list of things to be finished before the roof is complete is the installation of the ridge tiles. These are triangular shaped tiles that cap the intersection between each side of the roof, known as a ridge. With the slates completed, it's the only area still vulnerable to water penetration - so it should be tackled first. It's also probably the last "large" job - all the other items on the list are smaller, less strenuous tasks. That being said, I had no idea how "large" and "strenuous" installing these ridge tiles would be...

Back in March, when I decided to complete the roof myself , it was primarily because it appeared that most of the work ahead involved small, precise tasks - perfect for one person. Over these last few months, that has remained true - until these last three days.

Installing these ridge tiles proved to be the most exhausting work I've encountered so far. It's not that the tiles are heavy, or difficult to lay - it's the combination of all the tasks required at the same time. The primary culprit was mixing the mortar, which in itself is not hard, but it involves carrying heavy bags of cement and sand, mixing pail after pail of the stuff with a shovel, and then finally carrying the heavy pail to where it's needed. Now with the mortar in hand (or more precisely "in trowel") it is placed onto the dampened slates. The ridge tile is then placed onto that heap of mortar - if you happen to be a professional then you're done, if not (like me), you end-up making a mess...the mortar goes everywhere, and you then have to clean it before it dries...

I now understand (the hard way!) how much skill and experience goes into laying bricks or tiles - and how easy the professionals make it look. I also have learned (the hard way!) why making the mortar is usually the job of the most junior tradesman, or day laborer - it's exhausting, unending and dirty work.

...I soon realized that every ridge tile took about a bucket of mortar - so laying even a single tile took a long time...

So, like many other moments of this project, it was time to buckle down and just do it...but if there's ever a next time...I'm definitely getting help - or better yet, a mason...

Morning of June 20 - the "Hip Iron" will hold the tiles in place while they dry
Laying the first bed of mortar. Dampening the slates provides better adhesion of the mortar - this also applies to the ridge slates which are soaked in water (bottom right corner)
The first tile in place - so far so good...
A few tiles into it, I'm getting tired, and it's getting messy. Another reminder of my limited skill with a trowel...
Almost done...
The first corner is completed! As it was early afternoon by this point (and raining) I took a break and moved on to some less taxing tasks for the rest of the day.
The next morning - July 21nd - a long road ahead...
The first two tiles in place
Towards the end of the afternoon a little over halfway there
Looking down - finally starting to feel like progress

Making Mortar: Add sand and cement; mix together dry; add water; mix until a smooth, buttery texture. Repeat...
Nearing the top - a bed of mortar
It's 9pm - have been at this for 11 hours. Finally reached the top and turned the corner - time to call it a day
Morning of June 22rd - laying the tiles along the roof's ridge
The bed of mortar for the last tile - it's starting to rain, so it's good to be finishing
Montage of the completed ridge tiles
Montage of the completed ridge tiles