The parts: the black "soil" pipes, elbows and connectors |
The new loo - before installation |
Our plumber soldering the water pipes |
Placing the water cistern into the wall (it will be hidden eventually) |
Setting up the cistern |
Setting the exterior vent pipe |
The finished loo (the walls and tiles will be added later) |